Power-wash, prep, prime, and paint with Houston-humidity-rated coatings that last 7–10 years. Family-owned with a perfect 5.0 Google rating.
Hedwig Village incorporated in 1954, adopted a zoning ordinance the following year, and has stayed a small residential city on the south side of I-10 ever since. Its exteriors span that whole period. Census data puts the median build year at 1974, and about 62 percent of homes predate 1980, so much of what we paint here has wood trim, soffits and fascia that have been through decades of Houston summers and repaint cycles. Newer houses on the same streets add their own surfaces and details to the mix.
The weather is standard Houston, which is hard on paint: high humidity most of the year, strong summer sun and heavy rain from tropical systems. The Harris County Flood Control District estimated that Hurricane Harvey flooded nearly 136,000 structures across the county in 2017, and homes that took on water or wind-driven rain may still have hidden rot at sills and door frames. On older houses, we expect some wood repair and test loose paint for lead before scraping. Then we prime bare wood, caulk open joints and apply two coats of acrylic suited to Gulf Coast heat.
We probe sills, door frames, the bottoms of trim boards and fascia under roof valleys, where water sits longest. Soft wood is cut out and replaced, and the end grain is primed before installation so the repair lasts.
On houses built before 1978, we test loose paint before scraping. If lead is present, we lay plastic beneath the work area and collect chips so they don’t end up in flower beds or the lawn.
Walls under deep eaves or big trees stay damp in Houston humidity. We wash with a mildew treatment, rinse, and let the surface dry before priming, then finish with a topcoat that contains mildewcide.
Every project follows the same workflow: written estimate, careful prep, premium paint, and a walk-through together at the end.
We inspect siding, trim, and fascia and flag any rot or repair work. You get a written quote within 24 hours.
Pressure-wash, scrape loose paint, repair rotted wood, caulk all gaps. The prep is 70% of the job.
Stain-blocking primer on bare wood, masonry primer on stucco/brick, bonding primer on Hardie.
Two coats of premium 100% acrylic exterior paint: Sherwin-Williams Duration, Benjamin Moore Aura, or PPG Manor Hall.
We walk the perimeter with you. Any spots you flag, we fix that day.
See our Hedwig Village hub page for all services, neighborhoods, and FAQs focused on Hedwig Village.
View the Hedwig Village painter page →Yes. We can keep the original color scheme or help you choose colors that suit a long, low house, such as a deeper body color with lighter trim. Prep matters more than color on these homes: we repair wood, replace failed caulk and test old layers for lead before any scraping.
We use 100 percent acrylic in satin or semi-gloss on trim, doors and fascia, since it flexes as wood swells and shrinks with the weather. On Hedwig Village homes where the old trim is oil-based, we prime with a bonding primer first so the acrylic doesn’t peel.
Yes. Spring Branch Middle School and Memorial High School are both in Hedwig Village, along with the Spring Branch ISD headquarters. We plan deliveries and ladder or lift setups outside drop-off and pickup times and keep our trucks off narrow streets during those windows.
Free in-home estimate. Written scope of work. No high-pressure sales, just honest pricing and good paintwork.